1. The process of calculating the resource requirement of a project is known as ?

scheduling

co-ordinating

resource aggregation

all of these

Answer: resource aggregation

Explanation:


2. An activity is ?

the beginning or end of a specified job

an element of work entailed in the project

the movement of heavy vehicles from one place to another

the progress of work upto a certain limit

Answer: an element of work entailed in the project

Explanation:


3. The construction of residential building are treated as ?

light construction

heavy construction

industrial construction

none of these

Answer: light construction

Explanation:


4. Each work should be planned with respect to ?

manner of execution of the work

urgency of the work

availability of resources

all of these

Answer:

Explanation:


5. The final technical authority of a project is ?

Assistant Engineer

Executive Engineer

Superintending Engineer

Chief Engineer

Answer: Chief Engineer

Explanation:


6. F.W. Taylor introduced a system of organisation known as ?

line organisation

functional organisation

line and staff organisation

none of these

Answer: functional organisation

Explanation:


7. CPM stands for ?

Combined Process Method

Critical Path Method

Common Planning Method

Critical Process Method

Answer: Critical Path Method

Explanation:


8. In construction work, the controlling function aims at ?

keeping a watch over the physical progress of each activity of the work

controlling the expenditure on each item of work

controlling the use of machines and materials

all of the above

Answer: all of the above

Explanation:


9. A drawback of the bar chart is that ?

all the activity are independent of each other

it is difficult to judge whether an activity is completed or not

the sequence of activities is not clearly defined

all of the above

Answer:

Explanation:


10. The first stage of a large construction work to ?

contract

design

conception

study and evaluation

Answer: contract

Explanation: