1. | The chart which gives an estimate about the amount of materials handling between various work stations stations is known as ? | |
2. | The occurrence of the completion of an activity, is called its ? | |
3. | CPM is ? | |
4. | The optimistic time represents ? | |
5. | The difference between the total float and free float is called ? | |
6. | In the critical path of construction planning, free float can be ? | |
7. | When float or slack of an activity is positive ? | |
8. | The time in which an activity will take to complete in case of difficulty, is called ? | |
9. | An activity requires ? | |
10. | PERT analysis is based ? | |