1. | For transmission of power over a distance of 200 km, the transmission voltage should be ? | |
2. | In aluminium conductors, steel core is provided to ? | |
3. | ln a D.C. 3-wire distributor using balancers and having unequal loads on the two sides ? | |
4. | The material commonly used for sheaths of underground cables is ? | |
5. | The loads on distributors systems are generally ? | |
6. | High voltage transmission lines use ? | |
7. | In A.C. S.R. conductors, the insulation between aluminium and steel conductors is ? | |
8. | In a substation the following equipment is not installed ? | |
9. | Pin type insulators are generally not used for voltages beyond ? | |
10. | The top most conductor in a high transmission line is ? | |