1. The main disadvantage of concrete roads is that ?

the initial cost is high

it requires skilled personnel for construction

it requires cautious handling of the material

all of the above

Answer: all of the above

Explanation:


2. The structure of a road is composed of ?

sub-grade

sub-base

base

all of these

Answer: all of these

Explanation:


3. Valley curves are required to be introduced ?

a negative grade meets a positive grade the situations where

a negative grade meets another milder negative grade

a negative grade meets a steeper positive grade

all of the above

Answer: all of the above

Explanation:


4. The factor which influences the design of curves, is ?

speed of vehicle

maximum permissible super-elevation

permissible centrifugal ratio

all of these

Answer: all of these

Explanation:


5. According to IRC: 52-1973, the first stage for fixing up alignment of a hill road is ?

trace cut

detailed survey

preliminary survey

reconnaissance

Answer: reconnaissance

Explanation:


6. At the end of the reconnaissance phase, the selected alignment is pegged by using about 2m poles on which the ?

number of peg is marked

direction of proposed alignment is marked

distance between the two pegs is marked

all of these

Answer: all of these

Explanation:


7. Which of the following statement is correct ?

The sub-base thickness is directly proportional to the group index of the soil

The higher the group index of the soil, the larger is the thickness of the sub-base

If the group index value of the sub-base is between 5 and 9, then the sub-base is poor

all of the above

Answer: all of the above

Explanation:


8. The longitudinal levels, in detailed survey of a hill road, should be taken at ............... intervals ?

4 m

6 m

8 m

10 m

Answer: 10 m

Explanation:


9. The longitudinal joints may be ?

tongue and groove type

butt type

weakened plane type

all of these

Answer: all of these

Explanation:


10. In CBR test, the value of CBR is calculated at ?

2.5 mm penetration only

5 mm penetration only

both 2.5 and 5 penetration

none of these

Answer: both 2.5 and 5 penetration

Explanation: