1. | In jobbing production ? | |
2. | The process capability of a machine is defined as the capability of the machine to ? | |
3. | PERT is appued for ? | |
4. | Dispatching ? | |
5. | Time study is used to ? | |
6. | CPM requires ? | |
7. | At the break even point ? | |
8. | The aim of value engineering is to ? | |
9. | Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved ? | |
10. | Probabilistic time for completion of any activity can be found out from ? | |