1. The process of bevelling the end of a hole is called ?

counter sinking

counter boring

spot facing

boring

Answer: counter sinking

Explanation:


2. Segmental chips are formed during machining of _________ ?

high carbon steel

cast iron

high speed steel

mild steel

Answer: cast iron

Explanation:


3. Segmental chips are formed during machining of _________ ?

high carbon steel

cast iron

high speed steel

mild steel

Answer: cast iron

Explanation:


4. The rate of feed depend up on ?

finished required

material of tool

material of job

all of these

Answer: all of these

Explanation:


5. Calculate the rpm for a high speed steel drill 12 mm to cut aluminium. The cutting speed for aluminium 50m/min ?

332 rpm

663 rpm

1326 rpm

4163 rpm

Answer: 1326 rpm

Explanation:


6. Find out the speed settings (rpm) for a high speed steel drill d 24 mm to cut a work peace of phosphorus bronze. Maximum cutting speed with hss for phosphorus bronze is 35m/min ?

200

460

600

1000

Answer: 460

Explanation:


7. Which one among these is not a chip ?

continues

discontinuous

continues with built-up edge

spiral

Answer: continues with built-up edge

Explanation:


8. A finish cut is given to the improve the surface finish of a rough milled work peace. Which one of the below mentioned statement of true ?

decrease cutting speed, feed rate and depth of cut

increase feed rate, depth of cut and reduce cutting speed

increase cutting speed, feed rate and depth of cut

increase cutting speed, reduce feed rate and depth of cut

Answer: increase cutting speed, reduce feed rate and depth of cut

Explanation:


9. You have to machine a flat surface on a work peace of five meter length. Which machine will you have choose for this ?

milling

shaper

lathe

planner

Answer: planner

Explanation:


10. The lowest possible out of feed will give ?

good surface finish

medium surface finish

poor surface finish

none of the above

Answer: poor surface finish

Explanation: