1. The usual proportion of ingredients in reinforced cement concrete is ?

Portland cement (1 part), clean sand (2 to 4 parts) and coarse aggregate (1 to 2 parts)

Portland cement (1 part), clean sand (1 to 2 parts) and coarse aggregate (2 to 4 parts)

Portland cement (1 part), clean sand and coarse aggregate (2 to 4 parts)

any one of the above

Answer: Portland cement (1 part), clean sand (1 to 2 parts) and coarse aggregate (2 to 4 parts)

Explanation:


2. Bulk specific gravity of an aggregate is defined as ?

the weight of oven dry aggregate divided by its absolute volume, excluding the natural pores in the aggregate particles

the weight of oven dry aggregate divided by its absolute volume, including the natural pores in the aggregate particles

the weight of aggregate required to fill a container of unit volume

the difference in weight of the aggregate in saturated surface dry condition and in moist condition

Answer: the weight of oven dry aggregate divided by its absolute volume, including the natural pores in the aggregate particles

Explanation:


3. The factor which effects the design of concrete mix is ?

fineness modulus

water-cement ratio

slump

all of these

Answer: all of these

Explanation:


4. The process of proper and accurate measurement of all concrete materials for uniformity of proportions and aggregate grading is called ?

proportioning

grading

mixing

batching

Answer: batching

Explanation:


5. The construction joints in cement concrete ?

should be located where bending moment is large

should be located where shear force is large

should not be provided at the corners

should be spaced at a distance of 3 m apart in case of huge structures

Answer: should not be provided at the corners

Explanation:


6. The final operation of finishing the concrete surface is called ?

screeding

floating

trowelling

none of these

Answer: trowelling

Explanation:


7. After the curing of 28 days, the concrete gains strength upto ?

40%

67%

100%

122%

Answer: 100%

Explanation:


8. For concreting of tunnel lining, the concrete is transported by ?

pumps

pans

wheel barrows

containers

Answer: pumps

Explanation:


9. When the batching of material is done by weight ?

the bucket in which the material is to be weighed should be cleaned thoroughly

the weighing machine should be levelled before placing the material

the chart should be prepared indicating the weight of each material used for different strengths of concrete

all of the above

Answer: all of the above

Explanation:


10. If 50 kg of fine aggregates and 100 kg of coarse aggregates are mixed in a concrete whose water-cement ratio is 0.6, the weight of water required for harsh mix is ?

8 kg

10 kg

12 kg

14 kg

Answer: 12 kg

Explanation: